replica rolex Umbrella coverage to prolong your liability. fake watches fake watches Some actions you'll be able to choose to save lots of with your 2nd household insurance policy. Set up an alarm technique, in the event you can, also get 1 that detects fireplace or strength failure. Set up a fence. Trying to keep factors away from the property while in the very first area is usually an excellent protection. Is your property in the gated group replica breitling replica breitling ? replica cartier replica cartier replica cartier watches replica cartier watches This can be excellent for an insurance policy lower price. Would be the 2nd residence a condominium? Condos have their particular distinctive issues replica watch replica watch . One example is the affiliation typically carries insurance policy to deal with the constructing but most periods won't protect your contents. Holiday properties are only that, family vacation properties, meaning that for a long time for the duration of the entire year replica rolexfake omega

Production stage of Mud tanks in DC Workshop

According to 60 days working overtime of DC Solid control. The mud tanks already finished the welding process and to sand blasting.

mud tanks

The mud tank detail requirements from the end user:

1. Mount 4 ” gun line inside the pit, photo attached in the email. Tank structure has to have the following tichnesses : 6 mm walls, 6 mm ribbed on roof, 8 mm bottom plate. Inclinated bottom toward the suction point. Equipped with gun line inside of 4″.
2. Covers on roof for checks with access lathers inside and outside. Handrails protection all around the pit. Acces stair on exterior have to be removable in case of need.
3. Suction flange conection has to be DN 200 PN 10. Discharge flange has to be DN DN 150 PN 10 mounted on the roof. Vent elbow, flange mounted DN 150 PN 10. Reducer shaft D55 SS AISI 304, iniside the tank shaft D 80, D 600 and diameter with pallets D 1016, material SS AISI 304.

mud tank

Painting request:

Execution:Tolerances for welding joints according to EN ISO 13920-AE, and for machined surfaces ISO 2768-MK. Hydrostatic test for at least 24 hours. Corosion protection consisting in sandblasting SA 2.5, interior paint with Epoguard V64020 – 500 microns, exterior paint with Epozinc 85 – 75 microns, Epocoat V164 – 125 microns, email plyurethane coat and primuran E1529 – 75 microns. Half grenn RAL 6024 and half white Ral 9010.

Next working of the mud tanks, please follow up my blog.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

quality replica watchesreplica rolex copy breitling watches copy breitling watches swiss replica breitling swiss replica breitling